What Do You Need to Set Up a Jigger Dyeing Factory?

The sequence cannot be reversed: first define fabric type and order structure, then equipment. Fabric determines pressure type (cotton → atmospheric; polyester blends → HTHP); order structure determines roll diameter (fragmented orders → small roll; long orders → large roll); then size the number of machines. Beyond the jigger itself, you need pretreatment (desize/scour/bleach), rinsing, soaping, fixation, hydroextraction and stenter, plus wastewater treatment — environmental impact assessment and discharge permits must be in hand before equipment arrives. The classic new-shop mistake is buying machines first then finding work, resulting in mismatched equipment and idle capacity. The right approach: take three real customer orders' fabric type, width, and batch length, work backwards to machine type and count.

How Runda handles this

Factory sizing follows three steps: first choose SWR or GR by fabric, then roll diameter by batch length, then machine count by order volume. Give us three real orders' fabric and width, and we will work backwards to machine configuration — no buying first and finding work later.

Related equipment

Related questions

Wuxi Runda Dye-Finishing Equipment Factory
Qianzhou, Wuxi, Jiangsu, China 214181
Tel: +86-510-83383369 | Email: rd@runda2008.com | www.runda2008.com
Established 2004 | USCC 913202067573212793