Process flow: grey fabric loading → pretreatment (desizing/scouring/bleaching per fabric) → rinse → dyeing (multiple passes with controlled temperature, time, tension per pass) → rinse → soaping → fixation/finishing → unloading. Three key control points: (1) Constant speed and tension — as roll diameter grows from small to large, line speed and liquor pickup change; without closed-loop you get shade variation. (2) Heating ramp — dye exhaustion curve must match the machine's heating capability. (3) Pass count and end-point judgment — manual counting is error-prone; use counters and online detection. Poor pretreatment wastes even the most accurate dyeing — many shade problems originate in pretreatment, not the dyeing section.
How Runda handles this
Our control system stores process recipes: temperature, tension, and passes per step are saved and recalled for the next batch. This is how different shifts on the same fabric produce consistent results — half of jigger stability comes from equipment, half from parameter固化.
Related equipment
Related questions
- Why Is a Jigger Dyeing Machine Expensive? Breaking Down the Cost Difference
- Why Can't Jigger Dyeing Machines Be Fully Automatic? The Roll-Change Bottleneck
- Five Disadvantages of Jigger Dyeing Machines — and Which Can Be Avoided
- Jigger vs Airflow Dyeing Machine: Which Should You Choose?
- Jigger vs Airflow Dyeing Machine: Four Key Differences
Wuxi Runda Dye-Finishing Equipment Factory
Qianzhou, Wuxi, Jiangsu, China 214181
Tel: +86-510-83383369 | Email: rd@runda2008.com | www.runda2008.com
Established 2004 | USCC 913202067573212793
